Can I subdivide my block in Knox?

Knox covers Wantirna, Wantirna South, Bayswater, Boronia, Ferntree Gully, Knoxfield, Scoresby, Rowville and The Basin. Big suburban blocks make Knox popular for two-lot splits, but rules are much tighter in the Dandenong Foothills. Here's how to work out which side of that line you're on.

Step 1: find your zone

Every property in Victoria has a planning zone, shown on a free VicPlan Planning Property Report. Most of Knox sits in the "Knox Neighbourhood" areas, the majority of its residential land (Knox Housing Strategy).

The Dandenong Foothills are different. Knox's NRZ Schedule 1 covers the "Bush Suburban – Dandenong Foothills" areas (Knox Planning Scheme, NRZ Schedule 1). In the Foothills Backdrop and Ridgeline area, land in the NRZ must not be subdivided into lots under 1,000 m² (DDO Schedule 1), and council has noted a 2,000 m² minimum in Low Density Residential Zone land in the Foothills (Knox Council, Amendment C150 appendices). TODO(CD): these schedule versions date from 2016; confirm current minimum lot sizes on Planning Schemes Online before publishing.

Step 2: check the minimum garden area

In the General and Neighbourhood Residential Zones, a lot must keep a minimum share of its land as garden area. Under the state rules, that's 25% for lots of 400–500 m² and 30% for lots of 501–650 m² (Clause 32.09, Victoria Planning Provisions). On a smaller block, the garden area rule often decides whether a second home fits at all.

Step 3: look for overlays

Overlays add extra rules on top of the zone. The ones that most often affect a split in Knox are:

Step 4: check your title

Planning maps don't show what's registered on your title. Before anything else, get a title search and look for:

The faster VicSmart pathway

Since 16 October 2025, Victoria has applied the 10-business-day VicSmart process to eligible applications for two homes on a lot, and made more classes of residential two-lot subdivision eligible for VicSmart (Department of Transport and Planning). If heritage or flooding controls apply, the application may not be eligible for VicSmart (vic.gov.au).

Talking to council

Knox says it has 60 days to assess a subdivision permit application (Knox City Council: subdivision). TODO(CD): add the council's planning enquiries phone number.

Is it worth it?

Even when a split is allowed, the numbers don't always work. Surveyors, permits, civil works, service connections and contributions add up quickly, and they're often underestimated.

Start with our free Quick Zone Check. Enter your address and we'll email you your zone, overlays, approximate lot size and a likely, maybe or unlikely within minutes. If it looks promising, a Split Check ($390) estimates what the split would cost, what the new lot could sell for, and whether it stacks up.

Check my block free


This page is general information, not planning advice. Planning rules change: confirm your property's controls with Knox City Council or a town planner.